Hydro Power

PAN HIMALAYA logoPAN HIMALAYA ENERGY (P) LTD : Likhu 1 HEP can be developed either as a run-of -river (ROR) scheme project by utilizing the discharge of the Likhu river or as poundage run-of-river (PROR) scheme. The estimated rated capacity of the project is 51.40 MW, and it aims to develop hydropower energy in order to ease the power outage by evacuating power to the national grid.

The land required for the project development is 43.82 hectares and 71% of land has already been acquired. Field investigations, survey and DPR have been prepared. Detailed engineering design is in the process of completion. The approach road to the project site is currently under construction.
View Details



Globalhydropower logoGLOBAL HYDRO POWER ASSOCIATE PVT. LTD : The Likhu 2 HEP is a ROR hydroelectric project. The estimated Rated Capacity of the project is 33.40 MW. The land required for the project development is 31.9 hectares of which 4.94 hectares of land have been acquired. The remaining land area falls under the ownership of the government and the community.

Field investigations, survey and DPR have been prepared. Detailed engineering design is in the process of completion. The project road is currently under construction.
View Details



NUMBUR HIMALAYA logo NUMBUR HIMALAYA HYDROPOWER (P) LTD : Likhu A HEP is a run-of-river (ROR) project with an estimated generation capacity of 24.2 MW. The land required for the project development is 19.47 hectares, of which 3.97 hectares of land have been already acquired. The remaining land falls under the ownership of the government and the community. Field investigations, survey and DPR have been prepared and the detailed engineering design is in the completion stage. The project road is also under construction.
View Details



MINING logoMINING : TM DUgar Group has taken prospecting license for different types of mineral including lime stone, gold, copper, coal, etc. and working on their exploration.